A software company cleared a quarter of backlog in two weeks and made its fundraising deadline.

A software company with six engineers had investor meetings booked and 142 tickets it could not finish in time. We ran our factory next to their team, and 138 of those tickets were merged in two weeks, each one reviewed by their engineers.

Time to clear a quarter of backlog

Before13 weeks

With Harnet2 weeks

Before and after

The numbers before and after.

  • Time to clear a quarter of backlog

    Before: 13 weeks
    With Harnet: 2 weeks

    −85%

  • Open tickets

    Before: 142
    With Harnet: 0

Client
Software company, 6 engineers
First pull request
9 hours
Backlog cleared
2 weeks
Measured over
The two-week sprint and the month after

The situation

What the firm was dealing with.

The company had a fundraising round lined up and investor meetings on the calendar. The features investors expected to see were still among 142 open tickets, about a quarter of work for its team.

Hiring was not an option on that timeline. New engineers would have taken months to find and weeks to learn the codebase.

Before Harnet

  • 142 open tickets, about a quarter of work
  • Investor meetings three weeks away
  • No time to hire and onboard engineers
  • Engineers split between features and bug fixes

What we built

One system, built around how the team works.

  1. 01

    Backlog intake

    We went through the backlog with the CTO, split large tickets into small changes and agreed what done meant for each one.

  2. 02

    Factory lane

    Our agents took tickets in order, wrote the code and tests, and opened pull requests in the company’s own repository.

  3. 03

    Two reviews

    Our engineers checked each change first. Their engineers then reviewed and merged it, so nothing reached the product without their approval.

  4. 04

    Release checks

    Every change ran through the company’s existing tests and deploy process, plus the new tests written for it.

Checks and approvals

What it does on its own, and what stays with people.

The system handles the routine work. Anything that must be exact is checked by code, and anything hard to undo waits for a person.

  • Every pull request listed what it changed and which tests it passed.
  • Their engineers merged everything. The factory had no permission to deploy.
  • Database changes and billing code were marked for senior review before merging.

How the project ran

From first conversation to launch.

The team was using a first version within 9 hours. It then ran beside the team on real work until the results matched, and every correction became a new check.

  1. Hours 0–8

    Read the codebase and the backlog with the CTO and agreed the order of work.

  2. Hour 9

    Opened the first pull request for their engineers to review.

  3. Days 2–9

    Merged most of the backlog, with a 15-minute check-in with their team every morning.

  4. Days 10–11

    Finished the remaining tickets and ran a full regression test. Four tickets were dropped by the CTO as no longer needed.

  5. After

    The new features were live a week before the first investor meeting.

Results

What changed.

Measured over the two-week sprint and the month after, against the baseline we recorded before the project started.

  • 138tickets merged in two weeks, out of 142
  • 86%approved on their engineers’ first review
  • 0production incidents from the new code in the following month
  • A quarter’s backlog shipped in two weeks
  • Features live before the investor meetings
  • Their engineers approved every change
AreaBeforeAfter
Backlog142 tickets outstanding138 merged in two weeks
Fundraising demoMissing key featuresShipped a week before the meetings
TeamNeeded more engineersSame team, plus the factory

Does your firm have a process like this one?

Book a call