A software company cleared a quarter of backlog in two weeks and made its fundraising deadline.
A software company with six engineers had investor meetings booked and 142 tickets it could not finish in time. We ran our factory next to their team, and 138 of those tickets were merged in two weeks, each one reviewed by their engineers.
Time to clear a quarter of backlog
Before13 weeks
With Harnet2 weeks
Before and after
The numbers before and after.
-
Time to clear a quarter of backlog
−85%
-
Open tickets
- Client
- Software company, 6 engineers
- First pull request
- 9 hours
- Backlog cleared
- 2 weeks
- Measured over
- The two-week sprint and the month after
The situation
What the firm was dealing with.
The company had a fundraising round lined up and investor meetings on the calendar. The features investors expected to see were still among 142 open tickets, about a quarter of work for its team.
Hiring was not an option on that timeline. New engineers would have taken months to find and weeks to learn the codebase.
Before Harnet
- 142 open tickets, about a quarter of work
- Investor meetings three weeks away
- No time to hire and onboard engineers
- Engineers split between features and bug fixes
What we built
One system, built around how the team works.
- 01
Backlog intake
We went through the backlog with the CTO, split large tickets into small changes and agreed what done meant for each one.
- 02
Factory lane
Our agents took tickets in order, wrote the code and tests, and opened pull requests in the company’s own repository.
- 03
Two reviews
Our engineers checked each change first. Their engineers then reviewed and merged it, so nothing reached the product without their approval.
- 04
Release checks
Every change ran through the company’s existing tests and deploy process, plus the new tests written for it.
Checks and approvals
What it does on its own, and what stays with people.
The system handles the routine work. Anything that must be exact is checked by code, and anything hard to undo waits for a person.
- Every pull request listed what it changed and which tests it passed.
- Their engineers merged everything. The factory had no permission to deploy.
- Database changes and billing code were marked for senior review before merging.
How the project ran
From first conversation to launch.
The team was using a first version within 9 hours. It then ran beside the team on real work until the results matched, and every correction became a new check.
- Hours 0–8
Read the codebase and the backlog with the CTO and agreed the order of work.
- Hour 9
Opened the first pull request for their engineers to review.
- Days 2–9
Merged most of the backlog, with a 15-minute check-in with their team every morning.
- Days 10–11
Finished the remaining tickets and ran a full regression test. Four tickets were dropped by the CTO as no longer needed.
- After
The new features were live a week before the first investor meeting.
Results
What changed.
Measured over the two-week sprint and the month after, against the baseline we recorded before the project started.
- 138tickets merged in two weeks, out of 142
- 86%approved on their engineers’ first review
- 0production incidents from the new code in the following month
- A quarter’s backlog shipped in two weeks
- Features live before the investor meetings
- Their engineers approved every change
| Area | Before | After |
|---|---|---|
| Backlog | 142 tickets outstanding | 138 merged in two weeks |
| Fundraising demo | Missing key features | Shipped a week before the meetings |
| Team | Needed more engineers | Same team, plus the factory |
Does your firm have a process like this one?
Book a callMore case studies
Other firms we built for.
+18%
more quotes turned into orders
A building-supplies retailer quotes in minutes and turns 18% more quotes into orders.
Read the case study41%
faster to settle a standard claim
A regional insurer settles standard claims 41% faster, with handlers deciding every decline.
Read the case study27%
fewer missed appointments